Blar i ODA Open Digital Archive på forfatter "Chen, Ruey-Maw"
-
An efficient particle swarm optimizer with application to Man-Day project scheduling problems
Chen, Ruey-Maw; Sandnes, Frode Eika (Mathematical problems in engineering;, Journal article; Peer reviewed, 2014-05-06)The multimode resource-constrained project scheduling problem (MRCPSP) has been confirmed to be an NP-hard problem. Particle swarm optimization (PSO) has been efficiently applied to the search for near optimal solutions ... -
Flow Shop Scheduling Based on A Novel Cooling Temperature Driven Simulated Annealing Algorithm
Chen, Ruey-Maw; Sandnes, Frode Eika (Scientia Iranica. Transaction B, Mechanical Engineering;22(4), Journal article; Peer reviewed, 2015-01-05)The permutation flow shop problem (PFSP) has been applied to many types of problems. The PFSP is an NP - hard permutation sequencing scheduling problem. A local search with simulated annealing scheme involving two phases ...